Achieving a 2 Hour Floor Ceiling Assembly From the Underside Only

One of our current projects is a change of occupancy where the change will require a 2 hour rating between the main level A-2 occupancy and the R-2 occupancy above. The challenge in these situations is that you do not want to tear into the floor or change out the floor framing members. In new […]

Achieving a 2 Hour Floor Ceiling Assembly From the Underside Only Read More »