EVstudio (formerly neUdesign) had the opportunity to partner with a great team to produce the first Modular Hotel in the San Francisco Bay area. As Modular AOR for the Hilton Home2, EVstudio was able to leverage our years of industry experience to help bring the design to fruition. The offsite construction process was able to assist the developer in their goals of an expedited delivery in an urban setting, allowing the Hotel to be open 8 months ahead of the traditional build schedule.
The 155-room project was a hybrid design with the ground floor utilizing traditional construction and levels 2-5 utilizing a modular delivery method. EVstudio was able to complete the State Permit Submittal package and coordinate the modular portion of design with the project AOR to ensure proper coordination between the two delivery methods.