The City of Denver requires an inspection of waterproofing and foundation drain. I went out to Fillmore today to do that inspection and take some pictures. The building is big enough that there is 16″ of fall on the foundation drain to the sump pit. Also, note the hanuches and the ledge and beam pockets for the floor.
Author
Article Categories
Related Articles
Project Management in Full Bloom
EVstudio AEP
Meet the Team: Abraham Meshesha – Architectural Project Management
Abraham Meshesha
About EVstudio
EVstudio is a full-service in-house design firm specializing in architecture, engineering, planning, and other design services for commercial and residential projects.