Hyatt Summerfield Suites DIA – Post Tension Ribs Poured and Plumbing Going In

Summerfield DIA 2009 0822 004

I visited the Hyatt Summerfield Suites at DIA site on August 24, 2009 to see how progress is going and help with some needed modifications.  The foundation was looking great thanks to C and L Development.   The ribs below the post tension slab were in place while the plumbers were hard at work getting ready for the slab pour on Friday.

Milender White is the general contractor building the new hotel.  The team at Milender White has been great to work with.

Summerfield DIA 2009 0824 002

EVstudio engineered the post tension foundation for this 4 story 95,000sq ft hotel.