EVstudio civil engineering worked hand-in-hand with both a local school district and the Lakehurst Water and Sanitation District to relocate existing water main and modify the existing sanitary infrastructure. ~350 feet of 8″ main was relocated due to a modification to an access and street connection. This includes multiple bends and valves as well as easement relocation.
Client: Lakehurst Water and Sanitation District
Project Link: Click Here