Upcoming Changes in the 2012 International Energy Conservation Code
In its efforts to improve building energy efficiency by 30% the following improvements are being proposed in the 2012 IECC.
Home » Cost Estimating » Page 7
In its efforts to improve building energy efficiency by 30% the following improvements are being proposed in the 2012 IECC.
A very common question we get when designing multi-level commercial projects is: Will I need an elevator and how much
One thing that is often overlooked by civil engineers (or many engineers/architects for that matter) is the design component of
Contractors, Owners and Designers should be aware that the City of Arvada has five different wind zones of varying intensity.
EVstudio has been involved in a significant number of multifamily projects, both for architectural design as well as engineering. All
Hospitality projects represent a growing body of work that EVstudio has played a role on in recent years, both for

You read that right, steel fans — the MC12x14.3 will be available in the Denver market some time in September
In a continued effort to keep our readers informed of the most current construction cost trends on projects that EVstudio
In an apparent effort to justify their subscription service and annual product release, it seems that Autodesk (~$2.04b 2011 gross
Time again to look at the current construction market activity and analyze construction costs per square foot for various types
In an ongoing series to maintain the most updated construction cost information available to us from RSMeans, the leader in construction
In an ongoing series to maintain the most updated construction cost information available to us from RSMeans, the leader in construction
4600 Plettner Lane
Evergreen, CO 80439
By Appointment Only
9442 North Capital of Texas Highway
Plaza One, Suite 500
Austin, TX 78759
By Appointment Only