Designing multifamily developments, your residents crave while being a trendsetter for future investors.
From suburban luxury apartments to urban mixed-use chic multifamily developments, the design team at EVstudio know how to balance market trends with your pro forma.
Market Rate Development Projects
Spruce Hill
Spruce Hill
Near the town of Fairplay, EVstudio paired with Prospector and Fading West to design a unique collection of residences using modules from our standard plans library to support a variety of lifestyles in the South Park Valley of the Rocky Mountains.
The project developed three new modular master sets that were utilized on 21 different lots. These we designed using our base models and our bolt-on models as well as site built porches, garages and balconies that create some variation between units in exterior appearance and interior functionality.
The project started Design in March 2022, with early discussions about the unique modules and how to combine unique modules and garages.
Foundation Only Drawings were submitted July 2022 to allow foundations to be created and cured in the warmer summer months to be ready for modules that would be completed in the Winter.
Modular Permitting Drawings were submitted December 2022
The modules were produced starting February 2023 and completed in March 2023 (just 25 Days of Fabrication for 27 modules)
The site construction was completed by December 2023 (9 Months after Set)



Sawtooth Apartments
Sawtooth Apartments

EVstudio Partnered with Fading West to develop multi-family work force housing using modular construction. The project is the second phase to the Sawtooth Development, with Phase I being a series of Duplexes and ADUs that developed some land west of the County Fairgrounds at the intersection of Evans and 14th.
The project utilized modular construction to build a 3-story structure with 32 units. The structure is designed to utilize an innovative Geothermal Heat Pump system that required a site built mechanical room to house the equipment. The exterior is clad in a fiber cement panelized siding and corrugated metal siding that provides fire resistance to the structure and includes unique exterior shades that wrap around the corner of the structure and are shaded on the North and South sides over the entry doors but then become open on the west side. The shades also utilize angled columns to create a dynamic exterior.
Project Location: Gunnison, Colorado (Intersection of 14th and Evans)
Modular Manufacture: Fading West Building Systems
Site General Contractor: Fading West Construction
Client: Gunnison County
Project Square Footage: 30,500 SF
Units: 32-Units
Key Dates:
Contracted: September 2023
Foundation Only Permit Submitted: January 204
Modular Submission: March 2024 (6 Month Design Timeline)
State Approved May 2024 (2 Month Process)
Local Permit Submission: April 2024
Ground Breaking: June 2024
Modules Set: August 5-August 9 (4 Days to set 39 Modules)
Grand Opening: April 2025 (8-Month Construction)






Images of the interior are provided by Fading West, Courtesy of Joe Roode
Kit Carson Main Street
Kit Carson Main Street
In Eastern Colorado, a remarkable project recently came to fruition, fundamentally changing the landscape of Kit Carson. This endeavor, born from a powerful partnership between Kit Carson Rural Development and Fading West, transformed what were once two unhabitable lots into a vibrant new community of five much-needed homes. Truly, the combined efforts of EVstudio and these two entities were instrumental in navigating every stage, from initial concept to final occupancy, bolstering the community’s infrastructure and offering new opportunities for its residents.
The project developed five homes to offer a variety of sizes to meet diverse needs, thoughtfully designed to maximize comfort and utility. Four of the residences are spacious and comfortable, each spanning approximately 1,220 square feet, providing ample living space for families or individuals. Furthermore, a fifth home, generously sized at 1,600 square feet, was thoughtfully developed to meet Universal Federal Accessibility Standards (UFAS) requirements, ensuring it is fully accessible and inclusive to qualify for HUD financing. This commitment to accessibility underscores the project’s dedication to serving all members of the community, thereby ensuring that everyone can find a suitable and comfortable home. This addition boosted the total home inventory in Kit Carson to 100 homes for the area’s approximately 205 residents at the time, a substantial improvement for the community.
This development utilized modular construction in partnership with Fading West. This cutting-edge approach meant that while site preparation was underway in Kit Carson, the homes themselves were being meticulously built off-site in a controlled environment. Indeed, this method not only ensured consistent quality and precision but also significantly reduced on-site disruption and overall construction time, thereby accelerating the project’s progress efficiently.
Project Timeline:
The journey to bring these homes to life began in November 2021, marking the initial planning and conceptualization phase.
The project moved swiftly into the permitting stage, with applications submitted in June 2022.
The project began coming to life in November 2022, when the modules for these five homes began construction in Fading West’s Factory over approximately 1 month having completed fabrication December 2022.
Subsequently, in February 2023, the modules were set onto their foundations in Kit Carson. It was a rapid and impressive process, as nearly finished homes were lifted and precisely placed. Following the setting of the modules, the final touches and utility connections were completed with meticulous care and the exterior covered porches, balconies and garages were constructed.
By June 2023, a mere 19 months after the project began, the 5 homes were ready for occupancy, and new tenants began moving in, bringing new life and energy to the neighborhood.
The project won an Eagle Award where the affordable housing community of Colorado voted it as a People’s Choice project in 2024.



Pinon Park in Norwood, Colorado
Pinon Park in Norwood, Colorado
Pinon Park is a successful single-family affordable housing project completed in partnership with Rural Homes, built by Stryker Homes with Modular units from Fading West. Located in Norwood, Colorado – a picturesque town nestled amidst breathtaking natural beauty, known for its strong community spirit and access to incredible outdoor recreation. Yet, like many desirable areas across Colorado and the United States, Norwood has faced a growing challenge: an acute shortage of affordable housing. This scarcity has made it increasingly difficult for the very professionals who keep the town running – the dedicated teachers, essential healthcare workers, first responders, and small business owners – to afford to live where they work. That’s why we are incredibly proud to have partnered with Rural Homes to deliver a vital and transformative solution: a new affordable housing development right here in Norwood. This project isn’t just about constructing buildings; it’s about investing in the heart of a community and empowering its workforce.
The development features 26 thoughtfully designed single-family homes, each approximately 1200 square feet. Our architectural team focused on creating open, inviting, and highly functional layouts that maximize space and natural light. We incorporated design elements that complement Norwood’s natural aesthetic, blending modern comfort with a respect for the local environment. Special attention was paid to creating durable, low-maintenance exteriors suitable for Colorado’s climate, ensuring these homes will serve residents for decades to come. From the robust structural integrity engineered to withstand local conditions, to the carefully optimized mechanical, electrical, and plumbing systems designed for efficiency and comfort, every technical detail was considered. Our MEP team ensured that each home is equipped with reliable, energy-conscious systems, contributing to lower utility costs for residents – a crucial factor in affordable living.
Timeline:
Design Started in March of 2022, with Drawings submitted for these homes in July of 2022. The modules were built from August of 2022 through December 2022. Foundations were in the ground by October 2022, Modules set in December 2022 and the project was completed in April 2023.


Gateway Village Leadville Colorado
Gateway Village Leadville Colorado
EVstudio worked through multiple iterations of the 45-acre parcel. This included the analysis of Large Single Family, Modular Workforce Housing, Hotel/Retail use, and a combination of Multi/ Townhome/Single Family which was the final iteration. Each study included looking at the total vehicle impact, transit opportunity, CDOT access and cost along two state highways, as well as the water and sanitary waste of the potential district that would be formed for on-site treatment of 400+ units.
The site traversed over 100’ in vertical elevation and creating a layout that retained its existing vegetation while terracing down the slope was critical for PUD approval with the community. The layout was intended to create a central corridor of traffic with branches of development to allow each area to maintain privacy and the Leadville
atmosphere.
Project Link: Click Here

Midland Apartments in Buena Vista Colorado
Midland Apartments in Buena Vista Colorado
EVstudio partnered with Fading West Development and the Town of Buena Vista to design innovative modular workforce housing in Buena Vista, CO. The project features two identical buildings, specifically crafted to meet the housing needs of this mountain community while providing flexible and cost-effective solutions. The modular apartment design optimizes space efficiency, offering modern, comfortable living options that blend seamlessly into the surrounding environment.
This workforce housing development reflects EVstudio’s expertise in modular architecture, providing durable and sustainable housing solutions that are both functional and affordable. Designed to withstand the unique challenges of a mountain climate, these modular units offer a high-quality living experience for residents, supporting the growth and sustainability of the local workforce. This project exemplifies our commitment to designing versatile, scalable housing that meets the needs of communities in a cost-effective and efficient manner.
Project Link: Click Here

A partnership with EVstudio brings your project to a new level.
- Achieve the correct mixture of unit types and floorplans. We work with you to determine what unit combinations make the most sense for the project.
- Design units that allow expression and differentiation. We create spaces that maximize yield and functionality without being repetitive. Our multifamily projects read as a refined composition.
- Ensure efficiency of circulation. We design all projects to creatively account for required circulation, including driveways, sidewalks, stairs, elevators and corridors.
- Create the right choice of systems. Based on decades of combined experience, we optimize structural, mechanical and electrical systems for efficiency and functionality.
- Sustainable design options. Sustainability is a core strength, and something we can prioritize when crafting your building designs.