Your partner for education spaces.
Education and athletic facilities present a lot of unique challenges, including transportation flow concerns, infrastructure realignment, and tight construction timelines, to name a few. From new construction to additions and significant renovations, our civil team has designed for about every type of education facility possible.
By working hand-in-hand early, we can help clients get a realistic idea of their land development costs, challenges a site may represent before they purchase, and consult on how to take the best advantage of a site for their needs.
Education Civil Engineering Projects

Addenbrooke Classical Academy
Addenbrooke Classical Academy

Addenbrooke Classical Academy in Lakewood Colorado reached out to EVstudio when they wanted to design their new athletic soccer complex. The 70 yd X 110 yd synthetic soccer field project will not only enhance their school’s athletics but also allow for the use of the field by the community.
Client: Addenbrooke Classical Academy
Specifications: 70 yd X 100 yd synthetic soccer field | ~50 car parking lot | 5 Acres
Project Link: Click Here

The Lookout on Cragmor
The Lookout on Cragmor

The University of Colorado Colorado Springs (UCCS) required additional housing to support their ever-growing student population that wanted to live on or close to campus. The Lookout on Cragmor is a 5-story apartment building featuring 71 units that feature one to four-bedroom units. At lower than average construction costs, The Lookout was a positive solution that allowed UCCS to house students while being as close to campus as possible. Each student has individual access to their bedroom with a shared living room and kitchen areas. This particular student housing building also provides office space and a fitness center for student residents. Using EVstudio’s in-house multiple disciplines allowed the client to stay on budget while also providing high-design solutions attractive to today’s students.
The design of this student housing project is both modern and keeps in mind the safety of the students living in the building. Energy efficiency is a high priority for the University, so components such as high-efficiency lighting systems, hydronic heating, and building overhangs to provide solar shading were put in place in the design phase. Each unit was also given its own meter so it can be separately metered and served from a meter bank located on that floor.
Client: Newsome Development
Specifications: Wood frame | 81,905 GSF with 71 units
Project Link: Click Here

Goddard School
Goddard School

The Goddard School is a childcare and learning facility located in Reunion, Colorado. This facility features multiple classrooms, a kitchen, teacher offices, restrooms, playground, conference rooms, storage rooms, and onsite surface parking.
Specifications: Wood frame | 8,824 GSF
Project Link: Click Here

Englewood High School
Englewood High School

Englewood Schools has a long, proud history of athletics and community involvement. When they needed to upgrade their athletic facilities at Englewood High School, EVstudio worked hand-in-hand with their Design Advisory Group to ensure the renovation would not only meet their needs but inspire future students. It was our pleasure, and honor, to serve this great educational institution and help them achieve their athletic goals. Go, Pirates!
Client: Englewood Schools
Specifications: Addition of an 8th lane to track | New concession building | Revised stadium seating | New restrooms | New field lighting | New Scoreboard
Project Link: Click Here
From Design Advisory Committees to Community Input.
- Communication first, and always. We believe strongly in our personal connections with the team; in-person meetings and walking the project campus is a must.
- Public does not have to mean generic. We believe that there are too many generic facilities. Creativity and unique design that caters to students needs will always win.
- Client based documentation. We understand the balance of permitting at the different levels of jurisdictional review and format our plans for each review to ensure fast and efficient approval.
- Emphasizing green design. We blend environmentally friendly design with function to meet and exceed city or county standards.
- Collaboration at every phase. As the project scope evolves, we are accustomed to blending structural, electrical, and architectural components into our designs.