New builds, upgrades, and remodels. Mechanical design for any project type.
Innovative, integrated, and exceeding expectations. These are attributes that can be found in both our mechanical designers and plans. We also understand that time and budgets are equally important. At EVstudio, we pride ourselves on working early on in the design process to consult on system selection, helping our clients stay on track.
From basic energy modeling to Net Zero design for large complex projects, our team has the experience your projects require to match your sustainability needs within the budget.
Mechanical Engineering Projects
CrockSpot Restaurant
CrockSpot Restaurant
After a successful food truck enterprise, the owners of CrockSpot decided to open a permanent location in a newly renovated mixed-use office building called Block Forty45. EVstudio provided MEP tenant finish services including HVAC, range hood, electrical & plumbing design, and one-line diagram.
Client: Zaga Design Group
Specifications: Tenant Improvement | 1,300 sq.ft.
Project Link: Click Here
Oakwood Homes Corporate Office
Oakwood Homes Corporate Office
It is always an immense pleasure when our production home clients request our services for their corporate offices and design centers in addition to their home designs. Such was the case with Oakwood Homes when they needed to renovate their mechanical and electrical systems in their corporate office located in Denver, Colorado. Our MEP engineering team worked hand-in-hand with Oakwood to address their space needs while introducing them to cost-saving sustainable features such as office LED lighting. Not only is their open workspace now more comfortable with upgraded HVAC systems, but their new lighting allows for a better work environment. This long-term partnership is a perfect illustration of how we can service a client through their entire business life-cycle, no matter their needs.
Client: Oakwood Homes
Project Link: Click Here
RedRock Pharmacy
RedRock Pharmacy
The RedRock Pharmacy project is a pharmaceutical office TI project in a Class B office building located in Parker, Colorado. While similar to other office TI projects, there are multiple factors our MEP team had to consider when designing the space for our client. Since the tenant was mixing their own pharmaceuticals, the rooms had to be designed for a Controlled Environment with HEPA filters incorporated into the HVAC design. The building itself also served as a unique factor in the MEP design. Prior to the tenant selection of the office space, contractors had demolished the office and profoundly damaged the electrical components of the building. Our team of experts not only provided a design to accommodate the tenant but also to correct the damage to the overall building infrastructure. With our extensive office and medical renovation experience, our MEP team adhered to the high standards that medical spaces require and quickly identified potential construction concerns saving our client time and money.
Client: Sloan Design Studio, LLC
Specifications: Tenant improvement | 6,400 sq.ft
Project Link: Click Here
Teller Medical Office Building
Teller Medical Office Building
The Teller Medical Office Building is an innovative treatment center for those suffering from the effects of the opioid crisis in the Denver metro area. The project consists of 25,000 square feet of tenant improvement work in an existing three-story office building in Lakewood, Colorado.
Serving the segment of the population that has developed an opioid addiction from prescriptions for pain management for injuries or surgery, the three-story facility offers necessary services in one location: medical, physical therapy, and group counseling. To make appointments easier to accommodate for the users, space is also reserved for the family waiting. Imaging and ambulatory surgical services will be referred to dedicated facilities as needed, though imaging services may be incorporated in the future. For this project, our architecture and MEP engineering experts worked collaboratively to ensure this existing building meets all medical facility considerations while offering a comfortable and discreet place for patients to receive treatment.
Client: New Health Services
Specifications: Tenant Improvement | 26,700 GSF across three levels
Project Link: Click Here
University of Denver- Boettcher Auditorium
University of Denver- Boettcher Auditorium
At the University of Denver’s Boettcher Center Auditorium, a renovation was done to capitalize on unused auditorium space by reorganizing the space to add two additional classrooms. This re-imagining of space allowed DU to expand their usable space without addition and save then hundreds of thousands of dollars. The renovation also allowed for new accessible bathrooms, renovation of lab spaces, and upgrades to the mechanical, power, and fire protection systems.
There were some special design considerations for annexing new classroom space from a busy auditorium. A sound wall between classrooms B and C was also essential as these two classrooms are acoustically independent of each other for the convenience of the professors and students. An STC rating of 60 is typical in this kind of situation, and because using CMU was too costly, we achieved the rating with a metal stud wall partition. The key is getting a physical separation between the layers of sheathing on either side of the wall to isolate the vibrations. In this case, the wall cavity includes two layers of metal studs, one of which serves as a plumbing chase for a new drain line.
Client: University of Denver (DU)
Project Link: Click Here
University of Denver- Centennial Towers
University of Denver- Centennial Towers
Designing a space for a specific demographic can pose unique challenges. The University of Denver (DU) Centennial Towers were meant to be a place for brilliant minds to thrive, but these aging spaces needed an update. While the existing space had potential, the use of the main floor including common rooms, laundry facilities, and the Early Learning Center floor was out of date and no longer functioning as they once did. Before the renovation, the main floor was a sparsely populated space. Now the main floor is a hub of activity with students relaxing, studying, and meeting with friends.
Client: The University of Denver (DU)
Project Link: Click Here
Is your project in a jurisdiction with stringent codes that meet or exceed IECC? Rest assured that EVstudio can craft any mechanical system to the required code or sustainable level you need. We are your trusted design partner and can manage LEED, Energy Star, PACE and WELL Certified projects.
A partnership with EVstudio brings your project to a new level.
- Communication. We start every project with a meeting with our clients to understand their needs and to set the client expectations for systems and budget. We keep our clients in the know with constant email and or phone contact.
- Structural Coordination. With our integrated and cooperative design teams, we use Revit and Navisworks to coordinate with the buildings structural systems to create a truly buildable project.
- Vendors. We have great relationships with many local vendors ( including, but not limited to LONG, CFM Company, Trane, McCoy Sales, Carrier West, Air Purification Company) that help our designs stay on track and budget.
- General Contractors. Our relationships with local GC's and mechanical subcontractors allow us to offer a fully integrated team for our Tenant Improvement projects.
- Sustainable design options. Sustainability is a core strength and something we can prioritize when crafting your building designs.