![Front view toward entry](https://evstudio.com/wp-content/uploads/2010/01/Atwell-progress-0041-500x333.jpg)
I recently paid a visit to the Atwell residence to observe the progress there. As can be seen in the above photo, they are well underway in the framing stage and have just started putting up the upper level roof trusses.
![Atwell progress 019](https://evstudio.com/wp-content/uploads/2010/01/Atwell-progress-019-500x750.jpg)
The main level ceiling volumes of the vaulted master bedroom and stepped ceiling in the study are in place. For the Master Suite, the Atwells will have great and unspoiled views looking out to open space trails and Bergen Peak.
1 thought on “Atwell Residence in Evergreen Moving Through Framing”
Very good quality posts on your site!