Hyatt Summerfield Suites DIA – Getting Ready for Slab Pour
On Thursday, I stopped by to observe progress as everyone was hard at work preparing for tomorrow’s slab pour. So
Home » Archives for Jim Houlette » Page 8
On Thursday, I stopped by to observe progress as everyone was hard at work preparing for tomorrow’s slab pour. So
I visited the Hyatt Summerfield Suites at DIA site on August 24, 2009 to see how progress is going and
On August 18, the removal of the 2″ concrete flanges of the concrete double T wall began. EVstudio engineered the
I went over to the Diamond Building for a structural inspection and took a couple progress photos.
Are you trying to sell your home and the inspector found a few ‘concerns’? Or maybe, you’ve been wondering about
I’ve been questioned several times about adequate rib width for post tension slabs. For most people it makes perfect sense
The design properties for TJI joists 110, 210 and 230 and have increased starting in 2009 which in turn allows