Grateful Manor Construction Update Evergreen
I recently had the pleasure of leading a group of EVstudio engineers up to the building site of one of
Home » Projects in Process » Page 5
I recently had the pleasure of leading a group of EVstudio engineers up to the building site of one of
Our 190-unit multi-family project at Commonwealth Heights in Lone Tree, Colorado is at the midpoint of its 16-17 month construction
EVstudio was hired to produce full sets of structural plans for several Oakwood homes, including “The Taylin: Carriage House at
The EV engineers and architects recently stopped by a site to see the progress on a residence we designed. A
EVstudio was hired to produce full sets of structural plans for several Oakwood homes, including “The Yampa” house located in
Another great custom home is nearing completion. The exterior is mostly finished and dried in. The hardwood floors are in
This is my first project working at EVstudio where I had the opportunity to work architecturally from start to finish. It
EVstudio has several large apartment complexes under construction, the most recent is a collaboration with the Southern Land Company, and
The final touches are being applied to a EVstudio Custom Home in the Belcaro Neighborhood. This home is a rare
EVstudio was hired to produce full sets of structural plans for several Oakwood homes, including “The Gunnison” house located in
Here are some updated framing photos of two 1,600 s.f. urban houses that EVstudio recently completed. The two houses sit
A new home designed by EVstudio is currently under construction at 37th Ave and Raleigh St in Denver. The home
4600 Plettner Lane
Evergreen, CO 80439
By Appointment Only
9442 North Capital of Texas Highway
Plaza One, Suite 500
Austin, TX 78759
By Appointment Only