Beth Freeman and I went out to visit the project at 1620 S Fillmore St in Denver. The form work and rebar was in place for the foundation pours and I did that inspection. With the typical Denver inspection schedule we’ll go out two more times to inspect the vertical foundation walls, the foundation drain and the basement wall waterproofing.

I’m quite impressed by the vertical cut that the excavator was able to put in place and the turret forming is interesting.