CODE UPDATE: Significant Code Changes to the 2009 International Building Code – Fasteners
News from ICC: A modification to fasteners in preservative-treated and fire-retardant-treated wood (Section 2304.9.5) has been made to the 2009
Home » Engineering » Page 14
News from ICC: A modification to fasteners in preservative-treated and fire-retardant-treated wood (Section 2304.9.5) has been made to the 2009
The newest edition of the International Residential Code sees some changes to the requirements of wall bracing. A new requirement
The newest edition of the International Residential Code sees some changes to the requirements of wall bracing. One such change
The Highpointe Building 2 Project in Killeen, Texas is pursuing LEED Certification under the LEED for Core and Shell 2009
The “Licensed Professional Exemption”, as termed by the U.S. Green Building Council (USGBC), is a surprising feature (but surprisingly not
The Structural Department has been working with Earthcore SIPs to produce high quality and very detailed SIP shop drawings. For
Last week four historic train cars, including Locomotive #278, were removed from their resting place on the historic bridge in
A lot of larger, new construction houses in areas including Cherry Hills and Greenwood Village are facing more stringent regulations
EVstudio is working with SunBridge Healthcare on the complete renovation of their 47,000 square foot Pueblo Care and Rehabilitation Center
Fence posts can fail due to many reasons and it’s a real pain in the “back” to replace a damaged
Two major expenses on projects are the water and sewer tap fees. Depending on the type and size of the
EVstudio’s Structural Engineers are working with Earthcore SIPs LLC to provide high quality SIP walls, floors, roofs and foundation walls
Enter your details and we’ll send it right over!