LoHi Denver Apartments — Construction Update
EVstudio’s multi-family project in the LoHi Denver neighborhood is well into its first construction phase (see my post back in May,
EVstudio’s multi-family project in the LoHi Denver neighborhood is well into its first construction phase (see my post back in May,

Part 10 – Flooring, Cabinets, and Tile The end was in sight even though it was only July and there
Nor is a contemporary style. Current clients Erin and Matt proved these points to EVstudio. When clients come to the
Designing a new way to cook It is such a pleasure to be able to experience an EVstudio design
Blog 9 – Subs, Sheetrock, Insulation, Gas, …. And Xcel With an exhaustive sigh of relief, most of the significant

Part 8 – Electrical, Plumbing, HVAC, and Testing With the exterior waterproofing of the home well underway, the focus turned

Part 7 – Framing, Trusses, Walls, Weather Proofing…and Family Trusses and Lumber During the development of the plans, I started
I drew this quick sketch to explain the Acapulco Restaurant design to someone at the housing conference. Its drawn on
Part 6 – Time for Footings, Foundations, Slabs, Inspections, and Backfill…in January While I was waiting for permits, I started
BIM (Building Information Modeling) One of my Architecture professors once told me that the materials and methods you use to
Part 5 –Permits, Building Design, Contractors, …and more Permitting With the lot purchased and the home footprint and location refined,
I recently was part of a conversation with the Congress for the New Urbanism’s President, John Norquist, about the proposed