Effect of Overdriven Fasteners on Shear Wall Capacity
With the use of nail guns set too high and the speed of construction, many nails are over driven. Most
With the use of nail guns set too high and the speed of construction, many nails are over driven. Most
In a previous post, I discussed the sources of short- and long-term losses in unbonded post-tension tendons. Recently, a question
At this point, I think it’s fair to say that I’m a proponent of post-tensioned structures. I’ve found that they
This post is for all of those framers who diligently adhered to a structural framing plan to the letter and
We do a fair amount of work observing structures after a fire. Sometimes those fires start from a child with a cigarette lighter or
I just completed a job that involved placing a new roof top mechanical unit at an existing commercial building. The
I have been using Blackpoint for a little over a three months and I have to say it has been
This industry leading software is designed for Engineers and Estimators: Manage the complexity of the proper selection of hangers Provide
EVstudio’s forensic engineering services include Structural Assessment of Fire Damaged Wood Structures. We have provided observations and repair recommendations for
Our structural department recently worked with Crawlspaces2Basements to convert an existing basement that originally had a theater in the basement
In EVstudio’s structural engineering practice this question comes up almost every week. In contemporary construction, a ufer is a concrete
Our Greene & Greene inspired home is almost completely through framing! Most of the windows are in and the extensive
9442 North Capital of Texas Highway
Plaza One, Suite 500
Austin, TX 78759
By Appointment Only