Confirmed: Treated Lumber Now Looks Quite Similar to Untreated Lumber
It recently while performing routine structural observations it has come to find that the process of treating lumber has changed
Home » Engineering » Page 5
It recently while performing routine structural observations it has come to find that the process of treating lumber has changed
New for 2012 is the Simpson Strong-Tie ABW standoff post base. It will be available in March of 2012 and
I apologize if the title is misleading. The weight I am talking about is the weight of steel beams. Why
EVstudio provided Structural Engineering services for a recent remodel in south Denver. This remodel involved modifying the existing rafters and
Results are in, and EVstudio has won a spot in the 2018 ENR Colorado/Wyoming Top Design Firm award category. EVstudio
Why use a post tensioned slab-on-grade for your sport courts? Performance and long term total cost. A post tensioned concrete
A few weeks ago, I got a great question regarding the reinforcement of concrete slabs-on-grade, so I thought I’d take
As today’s architectural design trends toward more open floor plans with vaulted ceilings there is a need for economical rafters
After the destruction caused by the 1995 Kobe earthquake the Japanese government took it upon themselves to construct the world’s
There are many situations were it may become necessary to attach a timber ledger to a concrete wall. It is
The first step in preparing for the LEED Certification process on a building project is the formation of the LEED
Often in larger scale commercial developments, vertical circulation is handled by escalators in addition to elevators in order to move
4600 Plettner Lane
Evergreen, CO 80439
By Appointment Only
9442 North Capital of Texas Highway
Plaza One, Suite 500
Austin, TX 78759
By Appointment Only