Trusses Go Up at Kershenstein’s Honka Log Home

Kershenstein Trusses Framing

On Sunday I stopped by the Kershenstein residence to see what progress has taken place. Along with the upper floor framing and upper framed walls, the upper level trusses look to be almost all in place. Also on the lower level, temporary bracing is in place until the stone clad concrete masonry columns are built to support the main level deck above.

Author

Article Categories

Related Articles

Popular Articles

About EVstudio

EVstudio is a full-service in-house design firm specializing in architecture, engineering, planning, and other design services for commercial and residential projects.

Contact EVstudio

Interested in learning more?

Careers

Interested in Joining EVstudio? View a list of our current openings below.